AI-powered MRP for contract manufacturers

Stop fighting spreadsheets.
Start planning with the BOM.

Blueprint explodes every forecast and work order through your real bill of materials — multi-level, every time — so you see component shortages before they stall the line, not after.

Connects to Sage 100 via ODBC Multi-level BOM explosion Built for co-packers
BOM EXPLOSION — LIVE99OPFGBFSWPKBLK · BEEF SWT POT KALE
FG 2.79M un CAP 4.65/un RCP 1.00/un PCH 4.65/un BEEF KALE SWT POT
Built for the realities of co-pack manufacturing
Multi-customer BOMs Sage 100 + Scanco Organic baby food Beverage pouches Multi-warehouse 6 production lines
The planning gap

Your ERP knows the BOM.
Your spreadsheet doesn't.

Sage tells you what's on a work order. It doesn't tell you that the pouch supplier is three weeks out, or that one ingredient drives shortages across nine SKUs. So someone builds that picture by hand, every week, in Excel.

01 — Visibility

Shortages surface on the floor

By the time a component shortage is visible, the work order is already scheduled and the line is waiting. The BOM existed in Sage the whole time — nobody exploded it against current inventory.

02 — Manual work

One planner, twelve spreadsheets

Forecast in one file. Open POs in another. Work orders pulled fresh from Sage every Monday. Reconciling them is a half-day job that's stale again by Wednesday.

03 — No recursion

Multi-level BOMs break the math

A finished good explodes to a recipe, the recipe explodes to raw materials. Most planning tools stop at level one — and miss the ingredient shortage three levels down that's actually the constraint.

The engine

One BOM explosion. Every level, every time.

Blueprint walks your bill of materials recursively — finished good to sub-assembly to raw material — and nets every component against on-hand inventory and open purchase orders.

Shortage review

See the shortage before it's a stoppage

Every component gets a live status: Critical, Short, Watch, or OK — driven by real coverage math, not a planner's gut feeling. Click through to see exactly which finished goods are pulling demand on that item.

  • Forecast demand + open work order demand, combined
  • Recommended buy quantity and order-by date, calculated
  • Source FG traceability — see what's driving every shortage
MRP Planning — Shortage Review
ItemTypeOn HandDemandStatus
99PCHBEFQR CPPKG904,5602.85MCRITICAL
52CAPBLUEGUALAPKG3.07M2.18MOK
87OSTRBRYPUR-DRM9,69741,200SHORT
99OBLKCHIARM18,16616,990WATCH
52PCHSTRLMGUALAPKG947,352612,400OK
WO availability

Know if a work order can actually run

Every open work order gets a material availability percentage, calculated from its exploded BOM against current stock and open POs — before it ever hits the schedule.

  • Component-level detail on click — required, on-hand, short, coverage
  • Filter by line, customer, status, and date range
  • Updates live as inventory and POs change
WO Availability
WO #ItemMaterial %Status
000000001257SK Beef Swt Pot Kale88%WATCH
L05206DLS Trop Mango Yogurt32%CRITICAL
000000001214MC Blueberry Acai 6x465%SHORT
000000001085SK Swt Pot Spinach 2x645%SHORT
Production scheduler

A calendar that works the way your planners think

Drag a work order to a new date and Blueprint checks capacity, weekends, holidays, and material readiness before you commit — across all six production lines, in one Outlook-style view.

  • Day, week, and month views — every line's WOs in one cell
  • Per-line capacity bars, color-coded by utilization
  • Warnings before you overload a line or schedule a holiday
Production Scheduler — Week
Mon
Tue
Wed
Thu
Fri
Sat
Sun
29
GUALA1·WO1085
G23·L05206D
30
PACKOUT·1214
1
G23·1257
MESPACK·1102
2
WALDNER·1190
3
GUALA4·1233
G23·1240
4
5
Ask, don't dig

"What should I buy today?"
Just ask.

Blueprint's AI assistant has live access to your inventory, forecasts, work orders, and BOM data — so it answers planning questions with real numbers, not generic advice.

  • Why is this item short — and which finished goods caused it
  • Which work orders are at risk of missing material
  • What's the most overdue purchase order right now
Blueprint AI
What should I buy today?
Three critical items need POs now:

99PCHBEFQR CP — short 1.9M units, drives 4 Serenity Kids SKUs
87OSTRBRYPUR-D — short 31.5K, lead time 14 days
52OBLKCHIA — short 12% on Mamma Chia recipe
Why is the pouch short?
4.65 units consumed per finished case across 4 SKUs. Forecast demand is 2.85M for Jul–Sep; on-hand is 904K with no open PO. Recommend ordering 2.5M units, 21-day lead time from Guala Closures.
8
weeks of rolling capacity and shortage projection, updated live
BOM levels — finished good to sub-assembly to raw material, fully recursive
6
production lines tracked with per-line capacity and utilization
1
ODBC bridge to pull live data straight from Sage 100
Pricing

Priced for one plant or twelve.

Every tier includes the full BOM engine. You're paying for users and connected lines, not for features held back.

Starter
$890 / mo
One plant, up to 3 planners.
  • Full multi-level BOM explosion
  • Excel import — no ODBC required
  • Up to 6 production lines
  • Standard email support
Start here
Enterprise
Custom
Multiple plants, custom integrations.
  • Everything in Growth
  • Multi-plant consolidated planning
  • Custom ERP integrations beyond Sage
  • Dedicated implementation team
Talk to us

See your own BOM explode.

Bring a forecast file and a bill of materials. We'll show you the shortages you didn't know you had — in the first call.